Figure 49 Routing the MPI (MODBUS) cable

TBD
12.
Route the MPI (MODBUS) cables as follows (Figure 49):
a.
Route the ILP connection panel section to the electrical cabinets.
The raised floor should be installed before connecting to the ILP.
b.
Route it to the front of PE1 and along bottom of the frame to the turnbar area.
c.
Connect JTBD of the cable to PTBD of the TBD.
d.
Route the remaining connector JTBD to the exit are of PE2.
Connect it to PTBD of the TBD.
13.
Connect the ProfiBus and CTNet cable connections at electrical cabinets M1 and M2 as
follows:
Cable
CA294-11200
CC428
Purple
Profibus
CA294-11200
CC428
Purple
Profibus
CA294-11200
CC428
Purple
Profibus
CA294-11200
CC428
Purple
Profibus
CA294-11200
CC428
Purple
Profibus
CA294-11200
CC428
Purple
Profibus
CTNet
10960
Green
CTNet
Green
09190
NOTE:
Origin point
Cabinet M2 80A7
connection
Cabinet M2 PLC connection
60A2
Cabinet M2 PLC connection
80A2
Cabinet M2 PLC connection
U3/VB2
Cabinet M2 PLC connection
U5/VBX
Cabinet M2 PLC connection
60A7
CTNET cable connection
JX57at M1
Unidrive 24U0 FB encoder
5-pin connection at UD75 in
Cabinet M1
All electrical cables will be routed under the floor platform as
necessary.
CA294-03070 rev 00
End point
Cabinet M1 53A5
connection
Purple cable terminator
should be turned off.
Cabinet M1 53A5
connection
Cabinet M1 53A5
connection
Cabinet M1 53A5
connection
Cabinet M1 53A5
connection
Cabinet M1 53A5
connection
Connection at Unidrives
Cabinet M2 U029 turn
bar feed (FX) controllers
5-pin connection at UD75
Installation Manual
Notes
Connection is on
top of cable
11190.
Verify connection
Verify connection
Verify connection
Verify connection
Verify connection
page 69 of 153

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W3250

Table of Contents