Quick Reference Checklist - HP Indigo Division Series Instruction For Use & Installation Instructions

Table of Contents

Advertisement

Quick reference checklist

The following procedure is a quick reference guide of the installation procedure intended for two
integrators and extended over five days.
Heading
st
1
Day
Pre-installation
Site
preparation
Measuring
and marking
Unpacking
Installation
Electric
cabinets
(20 mins)
U-bases
(40 mins)
Printing
engines
(160 mins)
Step
Reference
1.
Verifying site
preparation on page
23
2.
Marking the
pressroom floor on
page 23
3.
Unpacking the boxes
on page 23
4.
Installing the
electrical cabinets on
page 24
5.
Position the u-bases
on page 24
6.
Position the foresight
stand on page 28
7.
Install the junction
bars on page 32
8.
Mount the PE2 on
page 33
9.
install the platform on
page 43
10.
Mounting the turnbar
on page 44
11.
Mounting the PE1 on
page 45
12.
level each printing
engine on page 46
13.
align the printing
engines on page 49
14.
Securing the turnbar
on page 54
15.
connect the printing
engines on page 56
CA294-03070 rev 00
Procedure
Verify site preparation as per Site
Preparation Guide
Use marker pen to mark profile of press,
cabinets, unwinder, ILP and Finisher on
floor
Unpack the boxes and verify their contents
either with the BOM or Packing list on page
17.
Install electrical cabinet M1 and M2 in their
marked position.
Position the u-bases on the floor. Adjust
distance between u-bases to 693.0 mm at
a height of 200 mm. from the floor.
Use surveying tool to align u-bases
accurately. Raise the tripod and surveying
tool to 1550.0 mm.
Install the junction bars between the two u-
bases.
Mount the PE2 on the u-base. Use the
lifting and positioning assembly.
Install the platform between the printing
engines.
Mount the turnbar assembly to PE1.
Mount the PE1 on the u-base. Use the
lifting and positioning assembly.
Level each printing engine to an accuracy
of 0.0 ± 0.1 mm
Accurately align the printing engines
horizontally using the surveying tool.
Mount the front and rear connection
brackets on the extended shaft of idler 3.
Install using M5 screws at front and rear.
Install collar on idler at rear.
Recheck the alignment using the surveying
tool.
Install front link brackets to attach two PEs.
Recheck alignment using surveying tool.
Check parallelism between PEs using the
parallel jig. Measure to an accuracy of
0.00 ± 0.01 mm
Installation Manual
Notes and
check
Site Preparation
check list
Marker pen
Cable meter
Packing list
Packed with PE2
page 8 of 153