Install System Components; Unpacking The Ilp, Unwinder, Utility Cabinets, And Ink Cabinets - HP Indigo Division Series Instruction For Use & Installation Instructions

Table of Contents

Advertisement

Install system components

1.
For each printing engine, unpack the section and perform the following:
a.
Install the PTE/air knife.
b.
Install the scorotron units.
c.
Install the cleaning station and wiper blade.
d.
Install the ITM cover.
e.
Thoroughly clean the BID units with imaging oil and a lint-free cloth.
f.
Install the BID units.
Make sure that the BID units are thoroughly clean before installing them. If necessary
re-clean the BID units.
g.
Install the Ametek filters.

Unpacking the ILP, unwinder, utility cabinets, and ink cabinets

1.
Unpack the ILP, unwinder, two utility cabinets and two ink cabinets.
2.
Lift and move the ILP, unwinder, utility cabinets, and ink cabinets to the raised floor platform.
If necessary, use a pallet jack to raise the units to the raised platform.
CA294-03070 rev 00
Installation Manual
page 80 of 153

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W3250

Table of Contents