Figure 4-51
4.6.2
Uploading a device as a new station
Precondition
● There is a physical LAN connection between the drive and the PG/PC.
● You have created a project or have opened an existing project.
Commissioning with Startdrive
Commissioning Manual, 12/2018, 6SL3097-5AA10-0BP0
4.6 Alternatively: Loading the configuration of the drive into the project
Getting Started
Commissioning
143