Panasonic EBL512 Operating Instructions Manual page 143

Fire alarm system ebl512 v2.3.x
Hide thumbs Also See for EBL512:
Table of Contents

Advertisement

Panasonic Electric Works Fire & Security Technology Europe AB
MEW00748
Rev: 1
35
Operating Instructions Fire alarm system EBL512 V2.3.x
Replacing a TLON connection
board and/or a main board
By the TLON network programming, some unique data will be stored
in a memory on the 1590 TLON connection board and some unique
data will be stored in a memory on the 1556 main board.
After replacing a TLON connection board to another or replacing both
a TLON connection board and a main board, do "Replace", "Update"
and "Save" in TLON Manager.
After replacing a main board to another (not the TLON connection
board), do "Update" and "Save" in TLON Manager.
141

Advertisement

Table of Contents
loading

Table of Contents