Operating Instructions Fire alarm system EBL512 V2.3.x

Annual control

The building occupier is highly recommended, once a year, to do
some tests, beside the monthly tests. To avoid the Fault tx output(s) to
be activated, they can be disabled via menu H8/S1 (or via an open
door, se chapter "Door open", page 29.).
Regarding the fault condition, see chapters "Fault", page 44 and "Fault
messages", page 45.
NOTE! Most of the faults have a delay.
Each control unit should be tested as follows:
• Perform monthly test (menu H1).
• Remove one battery fuse (F2 or F3 on the charger board
1557/1657). The following fault message is to be shown:
FAULT: Battery not connected CU xx
NOTE! xx is depending on control unit.
• Put back the fuse and acknowledge the fault (Menu H6).
• Remove fuse F5 (not F1 - F4) on the connection board
1555. The following fault message is to be shown:
FAULT: Supervised output 0, CU xx
NOTE! xx is depending on control unit.
• Put back the fuse and acknowledge the fault.
When output units type 2262 / 2263 are installed:
• Remove the battery fuse F3 on the rectifier p.c.b. The
following fault message is to be shown:
FAULT: Battery output unit xxxxxx
NOTE! xxxxxx is depending on output unit and control
unit.
• Put back the fuse and acknowledge the fault.
• Remove fuse F8 on the output p.c.b. The following fault
message is to be shown:
FAULT: Superv. output 3 tech.no. xxxxxx
NOTE! xxxxxx is depending on output unit and control
unit.
• Check the manual call points (the glass). Take required
measures. Use the manual call point alarm test key.
• Check some control outputs. Are they activated according
to programmed control expressions?
139