Epson C8 Series Manipulator Manual page 136

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

Maintenance 3. Covers
3.
NOTE
NOTE
4.
5.
122
Install the base cover to the Manipulator.
Hexagon socket head cap bolts: 11-M4×10
Tightening torque: 4.0 ± 0.2 N·m
Be careful not to get the gasket and cables caught between
the cover and the Manipulator.
Replace the gasket if there are flaws or deteriorations.
For cleanroom and protection models, install the gasket
between the heat sink and the base cover.
Install the heat sink.
Hexagon socket head cap bolts: 4-M4×15
Tightening torque: 4.0 ± 0.2 N·m
Install the fan.
For details, refer to Maintenance 15. Replacing the Fan.
C8 Rev.13

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents