Epson C8 Series Manipulator Manual page 275

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

7. Remove the bolts fixing the J4 flange and the Joint #4 reduction gear
unit.
Hexagon socket head cap bolts: 16-M3×20
8. Remove the wave generator of the Joint #4 reduction gear unit
together with the J4 flange.
If the wave generator does not come off easily, insert a tool in a gap
between the J4 flange and the Arm and remove the wave generator
little by little.
Be careful not to damage the parts.
9. Remove the Joint #4 reduction gear unit.
Hexagon socket head cap bolts: 12-M3×28
10. Remove the J4 sleeve holder.
Then, remove the J4 sleeve.
Hexagon socket head cap bolts: 4-M3×6
The J4 sleeve is attached by gasket and may not be removed easily.
If the part cannot be removed, pull the sleeve while rotating it.
Handle the sleeve with care since it is thin and easy to deform.
C8 Rev.13
Maintenance 8. Joint #4
261

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents