Epson C8 Series Manipulator Manual page 241

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

Removal: Joint #2 Reduction gear unit
1. Remove the Joint #2 timing belt.
For details, refer to Maintenance 6.3 Joint #2 - Replacing the Timing Belt, Removal steps (1) to (3).
2. Remove the following parts.
Battery
Battery board
Battery connector
For details, refer to Maintenance 11.2 Replacing the Battery Board, Removal steps (3) to (6).
3. Remove the battery box.
Countersunk screws: 2-M3×8
4. Arm #1 side arm fixing bolts.
Hexagon socket head cap bolts: 8-M6×25 (with a plain washer)
5. Remove the Joint #2 pulley 2 from the Joint #2 shaft.
Hexagon socket set screws: 2-M5×10
There is a brass bushing on one of the set screws.
Be careful not to lose it.
C8XL:
Remove the key from the shaft.
again. Be careful not to lose it.
6. Pull out the grease tube on the Arm #1 side from the fitting.
The grease tube connects between the base and the Arm #1.
C8 Rev.13
The key will be used
Maintenance 6. Joint #2
227

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents