Epson C8 Series Manipulator Manual page 205

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

11. Install the Joint #1 motor unit.
For details, refer to Maintenance 5.1.1 Joint #1 – Replacing the Motor (M/C Cable Backward),
Removal steps (1) to (4).
12. Pass the following parts through the hole inside the base to the
upper part of the base.
D-sub cable
Ground wire
RJ45 connector
F-sensor connector
13. Connect the ground wires.
Cross recessed head screws with washer
S, C models
P model
Tightening torque : 0.9 ± 0.1N·m (M4×8)
NOTE
The ground terminals of the D-sub cables have fixed installation positions. Install them to the two
screw holes. (Photo: indicated by the arrows).
14. Install the following parts.
Connector plate
Connector
Cable grounding plate
Brake power supply
For details, refer to Maintenance 5.1.3 Joint #1 – Replacing the Timing Belt (M/C Cable Backward),
Installation steps (6) to (14).
C8 Rev.13
: 9-M4×8, 2-M3×6
: 10-M4×8, 2-M3×6
0.45 ± 0.1 N·m (M3×6)
Maintenance 5. Joint #1
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents