Epson C8 Series Manipulator Manual page 160

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

Maintenance 4. Cable Unit
Installation: Cable unit (M/C cable backward)
1. Check if the cable unit contains the following parts.
Silicone sheet: 3 sheets (25 mm × 120 mm)
F-sensor connector housing 2 pieces
2. Remove the Ethernet cable from the connector.
Protect the cable ends with masking tapes to prevent the clip from
damage.
3. Remove the locking screws and nuts of the D-sub connector.
The screws and nuts will be used again for fixing the connector.
Be careful not to lose them.
4. Disconnect the following connectors to separate the cables.
Connectors:
X051, X061, X151, X161, XGND, BR051, BR061,
BT51, BT61, X71, X72, SW1
146
Silicon sheet
3 sheets
(25 mm × 120 mm)
C8 Rev.13

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents