General Procedure; System Exterior Visual Check; Physical Abnormalities - GE LOGIQ S8 Service Manual

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
DRAFT
EALTHCARE
D
5394227, R
IRECTION
EVISION
Section 4-3

General Procedure

SYSTEM REQUIRES ALL COVERS
CAUTION
Operate this unit only when all board covers and frame panels are securely in place.
!! CAUTION:
The covers are required for safe operation, good system performance and cooling purposes.
Lockout/Tagout Requirements (For USA only)
NOTICE
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
!! NOTICE:
on the system.
TAG
&
LOCKOUT
Signed
Date
4-3-1

System Exterior Visual Check

4-3-1-1

Physical Abnormalities

3
6
9
3
DRAFT (N
1
5
Figure 4-1 System Exterior
Chapter 4 - Functional Checks
17, 2011)
OVEMBER
2
4
8
7
S
ERVICE
10
11
LOGIQ™ S8
M
ANUAL
4-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents