Replacement Of Key Caps (By Special Native Language Keys); Manpower; Tools; Preparations - GE LOGIQ S8 Service Manual

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
DRAFT
EALTHCARE
D
5394227, R
IRECTION
EVISION
Section 8-14

Replacement of Key Caps (by special native language keys)

8-14-1

Manpower

One person, 30 minutes.
8-14-2

Tools

Regular Phillips screwdriver
A/N key assembly removal tool (shipped with AN keyboard)
8-14-3

Preparations

1.) Power Off/Shutdown the system.
8-14-4

Removal Procedure

1.) Using Tool A to remove "1" key and "ENTER" key.
3
DRAFT (N
Tool A, and Tool B
Figure 8-41
Figure 8-42
Chapter 8 - Replacement Procedures
17, 2011)
OVEMBER
LOGIQ™ S8
S
M
ERVICE
ANUAL
8-39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents