Installation Procedure; Functional Check - GE LOGIQ S8 Service Manual

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
RAFT
EALTHCARE
D
5394227, R
IRECTION
EVISION
3.) Remove the VNAV Option USB and power cable connectors from the VNAV.
Figure 8-104 Remove VNAVI Optioin USB and power cable connectors from VNAV
8-21-3-4

Installation Procedure

1.) Parts to be installed in reverse order of removal.
8-21-3-5

Functional Check

From Common Service Desktop (CSD), perfrom VNAV Test.
NOTE:
VNAV sensors must be connected to run the diagnostics.
8-80
3
DRAFT (N
Section 8-21 - Replacement of Peripheral Cable Assy
17, 2011)
OVEMBER
LOGIQ™ S8
S
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents