Regular Inspection For C8 Manipulator; 2.1 Inspection; Schedule For Inspection - Epson C Series Manual

Hide thumbs Also See for C Series:
Table of Contents

Advertisement

1. Regular Inspection for C4 Manipulator
This chapter describes maintenance inspection procedures. Performing maintenance
inspection properly is essential to prevent trouble and ensure safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
1.1 Inspection

1.1.1 Schedule for Inspection

Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and annual.
The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points must
be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.
1 month (250 h)
2 months (500 h)
3 months (750 h)
4 months (1000 h)
5 months (1250 h)
6 months (1500 h)
7 months (1750 h)
8 months (2000 h)
9 months (2250 h)
10 months (2500 h)
11 months (2750 h)
12 months (3000 h)
13 months (3250 h)
20000 h
h = hour
C series Rev.2
Regular Inspection 1. Regular Inspection for C4 Manipulator
Daily
Monthly
inspection
inspection
Inspection Point
Quarterly
Biannual
inspection
inspection
Annual
Overhaul
inspection
(replacement)
231

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4 seriesC8 seriesC12 series

Table of Contents