Toro Reelmaster 5010-H Diagnostic Manual page 193

Hide thumbs Also See for Reelmaster 5010-H:
Table of Contents

Advertisement

1. SV1 solenoid
2. SV2 solenoid
3. SV3 solenoid
5.
Unplug main harness connector P13 and use a multimeter to measure the resistance of the SV2 coil.
It should be approximately 7.1 ohms.
Pass
The measurement was good. Go to Step 4.
Fail
The measurement was bad. Replace the SV2 coil. Refer to Chapter 5 of the 5010-H Service Manual.
Go to
Returning the Machine to Service (page 22)
Step 4: Test the wiring harness for SV2 at connector P13.
Use a multimeter to test the resistance between the following pairs of locations:
Location
Harness
1
Seat
2
Main
1
Main
2
Connector
Pin
P75
5
P13
A
P13
B
(Ground)
Chassis ground
Figure 111
4. SVRV (SV4) solenoid
5. Lift manifold
and follow the steps listed.
Wire
Expected
Color
Reading
Violet
Less than
2 ohms
Violet
Black
Less than
2 ohms
193
Connector Graphic
g035764

Advertisement

Table of Contents
loading

This manual is also suitable for:

03674

Table of Contents