CC-Link connection (Intelligent device station)
1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for grounding.
The braided shield sections are used for grounding with a cable clamp.
Page 164 Grounding a cable
2.
Install a ferrite core to the cable in the positions as shown in the figure below.
CC-Link dedicated cable for connecting the GOT and PLC
GOT side
130
(5.12)
230 or less
(9.06)
CC-Link dedicated cable for connecting the GOT and GOT
GOT side
130
(5.12)
230 or less
(9.06)
External I/O device connection
1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for grounding.
The braided shield sections are used for grounding with a cable clamp.
Page 164 Grounding a cable
2.
Connect the braided shield to the connector with the connector cover.
3.
Twist the power cables.
GOT side
Braided shield
Connector cover
360 or less
(14.17)
5 EMC DIRECTIVE AND LOW VOLTAGE DIRECTIVE
160
5.2 EMC Directive Requirements
Ferrite core
(ZCAT3035-1330)
40
(1.57)
(1.57)
Ferrite core
(ZCAT3035-1330)
40
(1.57)
Power cable
40
(1.57)
PLC side
130
(5.12)
40
400 or less
(15.75)
(5.12)
40
230 or less
(1.57)
(9.06)
40
360 or less
(1.57)
(14.17)
Unit: mm (inch)
GOT side
130
Unit: mm (inch)
External I/O device side
Unit: mm (inch)