Mitsubishi Electric GOT2000 Series Hardware User Manual page 348

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Drawing software settings
Set the system information in the following procedure.
1.
Select [Common] → [GOT Environmental Setting] → [System Information] from the menu to display the [Environmental
Setting] window.
2.
Select [Use System Information].
3.
In [Read Device (Controller→GOT)], set [First Device].
4.
Click [Selection/Sort Setting] to display the [Selection/Sort Setting] dialog.
5.
Set [External I/O Function Output Information] as a target item.
Click the [OK] button.
6.
In [Write Device (GOT→Controller)], set [First Device].
7.
Once the settings are configured, click the [OK] button to close the [Environmental Setting] window.
Program example
The following shows a sequence program example.
System information: Set the read device to D101 (using the drawing software)
Wiring: Wire the operation switch of SW1 to X0, SW2 to X1, SW3 to X2, SW4 to X3, SW5 to X4 and SW6 to X5.
Device allocation: The LED lit is allocated from M10 with the sequence program.
X0
M10
.
.
.
.
.
X5
M15
M8000
MOV
9 HANDY GOT POWER WIRING AND SWITCH HANDLING
346
9.4 Switch Wiring
Lit in green when SW1 is pressed.
Lit in green if SW6 has been pressed.
Reads M10 to M17 and transfers them to device+1
D102
K2M10

Advertisement

Table of Contents
loading

Table of Contents