Chapter 10 Operating The Got; Outline Procedure To Start The Got - Mitsubishi Electric GOT2000 Series Hardware User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

10
OPERATING THE GOT
• Page 355 Outline Procedure to Start the GOT
• Page 358 Creating Project Data
10.1

Outline Procedure to Start the GOT

This section explains the outline procedure to operate the GOT.
Start
Preparing project data
Installing an extension unit and option
Installing the GOT, and power supply wiring
Writing package data
Connecting the GOT and the controller
Starting monitoring
End
Preparing project data
1.
Install GT Designer3 Version1 on the personal computer.
For how to install GT Designer3 Version1, refer to the following.
GT Works3 Version1 Installation Instructions
2.
Create project data with GT Designer3 Version1.
For how to use GT Designer3 Version1 and create project data, refer to the following.
GT Designer3 (GOT2000) Screen Design Manual
Installing an extension unit and option
1.
Install options other than the SD card and USB memory to the GOT.
For how to install options, refer to the following.
Page 226 Installing the Battery
User's Manual of each option
2.
Install an extension unit to the GOT.
For how to install extension units, refer to the following.
Page 223 Installing and Removing the Extension Unit
Installing the GOT, and power supply wiring
1.
Install the GOT to the control panel.
For how to install the GOT, refer to the following.
Page 200 Installing the GOT
2.
Carry out wiring of power cables for the GOT.
For the wiring of power cables, refer to the following.
Page 317 WIRING OF POWER SUPPLY SECTION
10 OPERATING THE GOT
10.1 Outline Procedure to Start the GOT
10
355

Advertisement

Table of Contents
loading

Table of Contents