Follow-up Procedure
Before connecting the power plug of a device to the PDU2000, loosen the locking
device on the PDU2000. After connecting the power plug, tighten the locking
device.

4.3.3.4 Connecting Cables Between the Lithium Battery and the UPS

Context
Procedure
Step 1 Connect power cables between lithium batteries and the UPS.
1.
2.
3.
Issue 02 (2020-12-25)
The busbars, batteries, power distribution unit (PDU), and UPS have been
installed.
If only one battery is configured onsite, battery cables have been preinstalled
in the battery position. If more than one battery is configured onsite, connect
battery cables.
The actual number of batteries depends on the onsite configuration.
Connect the positive battery terminal to the RTN+ port on the busbar and the
negative battery terminal to the –48 V port on the busbar.
Figure 4-111 Connecting cables between lithium batteries and busbars
Connect cables between the busbars and the PDU.
Connect cables between the PDU and the UPS.