FusionModule500 Smart Mini Data Center
User Manual
● A φ22 mm automatic drainpipe cannot be routed from the top. A φ6 mm
● After routing the pipe, secure it to the pipe assembly using cable ties.
● The drainpipe inside the indoor unit must be wrapped with the thermal
Figure 4-31 Drainpipe routed from the top
----End
Bottom Piping
Step 1 Take out a drainpipe connector from the fitting bag and put the connector on the
other end of the drainpipe, as shown in
Issue 02 (2020-12-25)
NO TICE
forcible drainpipe is used. The lift of the forcible drainage pump is 5 m.
insulation tubing in fittings.