FusionModule500 Smart Mini Data Center
User Manual
4.3.2 Grounding the Smart Module
1.
2.
Figure 4-102 General ground bar
4.3.3 Cable Connections to the Power Supply and Distribution
System
4.3.3.1 Top Cable Routing
Issue 02 (2020-12-25)
Connect the ground point in the cabinet to the general ground bar.
Connect the general ground bar in the cabinet to the floor ground bar or
collective ground bar.
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide
136