Management System Power-On Commissioning; Preparations And Webui Login - Huawei FusionModule500 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual
Figure 5-3 Charging refrigerant
(1) Refrigerant cylinder
(4) Connection nut
----End
Exception Handling
Step 1 Check that the T/H control mode and T/H set point are properly set.
Step 2 Check that the current time is correctly set.
Step 3 Check that the return air filter is installed in the correct direction.
----End

5.3 Management System Power-On Commissioning

5.3.1 Preparations and WebUI Login

Prerequisites
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
Issue 02 (2020-12-25)
Supported operating system: Windows 7 and later versions
It is recommended that the screen resolution be 1366 x 768 or higher.
Browser: Chrome, Firefox, Internet Explorer 11 or later
Copyright © Huawei Technologies Co., Ltd.
(2) Electronic balance
(5) Gas pipe needle valve
5 Power-On Commissioning
(3) Pressure gauge
(6) Liquid pipe needle valve
161

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents