5.
Install the access panel onto the outer cover of the control arm.
6.
Go to
Returning the Machine to Service (page 21)
Step 5: Test the cutting reel motor 2 voltage.
Note:
Observe proper electrical safety procedures when working with high voltage.
1.
Plug in the 48 V battery disconnect. Refer to
Cutting Reel Motors (page
2.
Verify connector P20 is unplugged.
3.
Move the key switch to the R
4.
Use a multimeter to test the voltage between the pair of locations shown in the following table.
Location
Harness
1
e-Reel
2
e-Reel
5.
Return the key switch to the O
6.
Plug in connector P20.
Pass
The voltage test passed. Repeat the diagnostic process.
Fail
The voltage test failed. Trace the voltage wiring between P20 and the 48 V fuse block. Go to
Returning the Machine to Service (page 21)
Connecting and Disconnecting the 48 V Power to the
18).
position.
UN
Connector
Pin
P20
1
P20
2
position.
FF
and follow the steps listed.
Wire
Expected
Color
Reading
Red (R)
32–67 volts
Black
(BK)
and follow the steps listed.
232
Connector Graphic