Installing The 19" (Chs2U) Chassis; Installing The Sv8100 Chassis; Figure 3-1 Chs2U Chassis (Front View) - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
2.3
3 - 2

Installing the 19" (CHS2U) Chassis

The CHS2U chassis has six universal blade slots for legacy line/trunk blade
(Single Line Telephone Interface, Digital multiline terminal Interface, Central
Office Trunk, ISDN PRI Interface, etc.). In-skin Application Blades (In-skin
UMS, In-Skin Router, etc.). It also houses the BUS Interface Blade, Power
Supply Unit (PSU) and Cooling Fan.
When the CD-CP00 blade is installed in the first 19" chassis, it is called the
controlling chassis. Additional chassis, called expansion chassis, can be
installed to increase the capacity of the system to meet the customer's
business needs. Each chassis (Expansion or Controlling), is powered by an
MPS7101 power supply.
Before proceeding with installation of chassis, ensure site preparation is
completed. The CHS2U chassis can be:
Wall-mounted – refer to
page
3-19.
Floor-mounted – refer to
page
3-40.
Stand-mounted – refer to
page
3-44.
Rack-mounted – refer to
page
3-54.
Universal Slot for Legacy Line/Trunk blades and
Application blades (six slots). When used as
controlling chassis, the CD-CP00 is mounted in Slot 1
Slot for PZ-BS10/PZ-BS11 blade
Power Switch

Figure 3-1 CHS2U Chassis (Front View)

3.1 Wall Mounting the 19" (CHS2U) Chassis on
4.1 Floor Mounting the 19" (CHS2U) Chassis on
5.1 Stand Mounting the 19" (CHS2U) Chassis on
6.1 Rack Mounting the 19" (CHS2U) Chassis on
(shown).
– Connection with CHS2U chassis
UNIVERGE SV8100

Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents