Floor Mounting The Chassis; Floor Mounting The 19" (Chs2U) Chassis; Chs2U Chassis Installation; Figure 3-47 Floor Mount Spacing Guide - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
F
S
4
LOOR
ECTION
4.1
3 - 40
M
OUNTING THE

Floor Mounting the 19" (CHS2U) Chassis

The CHS2U controlling and expansion chassis can be mounted on the floor
using the CHS BASE UNIT and the CHS2U JOINT BRACKET KIT.
4.1.1

CHS2U Chassis Installation

1.
Use the template shown in
Guide
(10mm) anchor bolts (locally procured).
2.
Mark and drill the four holes required to install the CHS BASE
UNIT.
3.
Using anchor bolts, secure the CHS BASE UNIT to the floor.
Refer to
C
HASSIS
Figure 3-47 Floor Mount Spacing
for required spacing before drilling holes for 0.39"

Figure 3-47 Floor Mount Spacing Guide

Figure 3-48 Secure CHS BASE UNIT with Anchor
UNIVERGE SV8100
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents