Two Blade status LEDs
Two straps and one switch per circuit to determine the circuit type
Limitation depends on the connecting Router,
Multiplexer or Exchange. If the UNIVERGE
SV8100 is connected to another UNIVERGE
SV8100 directly, there is up to 1,500 ohms loop
resistance (including system).
Refer to the following table for maximum upgrade capacities of the
CD-4ODTB blade:
Table 2-4 SV8100 Maximum 9.5" Gateway and 19" System Capacities
– Blades on page 2-9
5.7.2

Installation

1.
Set the straps for either the 2-wire or 4-wire. Refer to
4-40 CD-4ODTB Blade on page
2.
Install the CD-4ODTB into a slot in the chassis.
When a router or multiplexer is connected
instead of a trunk, the SG terminal of the router
or multiplexer must be connected to the FG
grounding terminal on the UNIVERGE
SV8100 chassis. When a tie line trunk is
connected, the FG terminal must be connected
to the ground. If the FG terminal is not
connected correctly, the signal may fail.
When tie lines are connected to the system, be
careful of the Tip and Ring polarity.