Chs Large Batt Box Fuse Replacement; Figure 3-91 Install The Fan Access Panel; Figure 3-92 Removing Chs Large Batt Box Cover - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
3 - 70
6.
Insert the access panel tab into the rear of the CHS2U chassis
running the Battery Connection Cable through the cutout.
Secure panel with the retaining screw.
7.
Connect grounding and AC power cables.
8.
Apply power to chassis (refer to
the SV8100 System on page
7.2.4

CHS LARGE BATT BOX Fuse Replacement

1.
Loosen screw on front of CHS LARGE BATT BOX.

Figure 3-92 Removing CHS LARGE BATT BOX Cover

2.
Remove two screws from front of Battery Tray Suppressor
(Refer to
page
3-71).

Figure 3-91 Install the Fan Access Panel

4-8).
Figure 3-93 Removing Battery Tray Suppressor on
UNIVERGE SV8100
Chapter
4,
2.6 Powering Up
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents