Installing Expansion Blades In The 19" Chassis (Optional); Figure 3-4 Installing The Cd-Cp00 Blade; Figure 3-5 Cd-Cp00 Blade Installed - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
3 - 4
plane) is felt.

Figure 3-4 Installing the CD-CP00 Blade

4.
Gently push until the blade seats. Tighten the two retaining
screws on front of the blade.

Figure 3-5 CD-CP00 Blade Installed

2.3.2

Installing Expansion Blades in the 19" Chassis (Optional)

When adding additional chassis to the system to expand the
capacity, a PZ-BS10 must be installed in the Controlling Chassis and
a PZ-BS11 must be installed in all Expansion Chassis. This
connection is required with any multiple-chassis setup.
The PZ-BS10 connects the Controlling Chassis to the Expansion
Chassis by connecting to a PZ-BS11, which is installed on each
Expansion Chassis. These Expansion Interface Units allow the CPU
to transmit/receive data as required to the additional chassis.
The PZ-BS10 is installed in the EXIFU slot of the Controlling Chassis
which is equipped with a CPU blade. The PZ-BS11 is installed in the
expansion slot of the Expansion Chassis, which does not have a
CPU.
The EXIFU cable connects the Controlling Chassis and its PZ-BS10
interface to the second, third, and fourth PZ-BS11 interface.
Use only the CAT 5 cables provided by NEC to make the
connections between the Controlling and Expansion Chassis.
UNIVERGE SV8100
Installing the SV8100 Chassis

Advertisement

Table of Contents
loading

Table of Contents