Battery Connection; Installing The Internal Batteries 19" (Chs2U) Chassis; Figure 3-67 Removing Battery Access Panel; Section 7 Battery Connection - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 9.0
B
S
7
ATTERY
ECTION
Two types of battery connection provide battery life during a power failure, the internal
battery and an external battery with CHS LARGE BATT BOX.
7.1
3 - 56
6.
Connect the ground wire to all chassis. Refer to
on 19" Chassis on page 3-14
system.
7.
Refer to
2.3.5 Install AC Power Cords on 19" Chassis on page 3-15
continue installation of the chassis or, Chapter 4 paragraph
Installation and Safety Precautions on page 4-3
C
ONNECTION

Installing the Internal Batteries 19" (CHS2U) Chassis

An internal battery source using two batteries can be installed using the
CHS2U BATT MTG KIT (mounting kit) and CHS2U BATT CABLE INT (internal
cabling).
CHS2U BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1.
Power down the CHS2U chassis.
Ensure the CHS2U chassis is powered OFF.
2.
Disconnect AC power and grounding cable from rear of chassis.
3.
Remove screws from battery access panel on rear of chassis.

Figure 3-67 Removing Battery Access Panel

2.3.3 Install Grounding
for complete details on grounding the
for installation of blades.
Installing the SV8100 Chassis
UNIVERGE SV8100
to
2.1

Advertisement

Table of Contents
loading

Table of Contents