Fujitsu M10 Product Notes page 23

Hide thumbs Also See for M10:
Table of Contents

Advertisement

If all XSCFs have not been restarted due to an error in the XSCF, establish a
connection to the control domain console again. Replace a failed XSCF or CPU
memory unit (lower) if a connection cannot be established to the control domain
console.
[SPARC M10-4S]
The poweroff(8) and reset(8) commands may not be executed normally if all XSCF
have not been restarted due to an error in a XSCF in the SPARC M10-4S that is
composed of more than two cabinets.
To disconnect the power of a physical partition (PPAR), login to the control
domain of the PPAR and execute the shutdown(1M) command on Oracle Solaris.
Then, disconnect the power of the PPAR using the poweroff -f command on the
XSCF firmware. The reset(8) command cannot be used in this state.
The -c wait option, which is used to set the air-conditioning wait time for the
setpowerupdelay(8) command, is not supported at present.
Ask your sales representatives regarding the support information of the dynamic
reconfiguration of the system board (PSB).
The command options related to the dynamic reconfiguration are as follows.
-c configure of the addboard(8) command
-c disconnect of the deleteboard(8) command (when the PPAR is powered on)
-c unassign of the deleteboard(8) command (when the PPAR is powered on)
The -p option of the diagxbu(8) command is not supported at present.
The setpciboxdio(8) and showpciboxdio(8) commands are not supported at present.
Active/hot addition of SPARC M10-4S is not supported at present. Perform
inactive/hot addition. For details, see
SPARC
M10-4S" in "Chapter 6 Information on SPARC M10-4S Hardware."
Replacement of a crossbar box using the replacefru(8) command is not supported
at present. For how to replace a crossbar box, see
crossbar
box" in "Chapter 6 Information on SPARC M10-4S Hardware."
Addition of a crossbar box using the addfru(8) command is not supported at
present. For how to add a crossbar box, see
2" in "Chapter 6 Information on SPARC M10-4S Hardware."
[SPARC M10-4S]
If you power on all physical partitions (PPAR) in a system that has more than one
PPARs with the poweron(8) command, the startup time taken when specifying
power-on of PPAR is longer than the time taken for batch power-on by specifying
-a.
[SPARC M10-4/M10-4S]
As for the ioreconfigure that can be specified by -m function of the setpparmode
(8) command, leave it as the default, false, and disable the I/O bus reconfiguration
function. If you enable the I/O bus reconfiguration function by specifying true to
the ioreconfigure, it may be necessary to reinstall Oracle Solaris.
"Restrictions on active/hot addition of
"Restrictions on replacing
"Restrictions on adding expansion rack
Chapter 2 XCP 2043-Related Information
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m10

Table of Contents