Chapter 11 System Management
11.2 Functions in the Action Area for System
4
5
•
"Specific days" is selected for the event type when "One day only"
is selected for the period, and the start time is later than the end
time
•
"Specific week" is selected for the event type when the start day
and the end day are the same, and the start time and the end
time are the same
•
"Specific week" is selected for the event type when the start day
is later than the end day
•
"Specific week" is selected for the event type when the start day
and the end day are the same, and start time is later than the end
time
•
The period is set to include Sunday
•
The period is 1 week or longer (the end date is set to "7 days"
when the end time is later than the start time)
•
When deleting the added event, select the event, and click the
[Delete] button.
•
When changing the added event, select the event, and click the
[Edit] button.
Repeat
Step 2
and
Step 3
After adding all the events, click the [Set] button.
→ A confirmation screen appears.
In the following conditions, an error screen appears:
•
"Schedule Name" has not been entered
•
"Schedule Name" matches with an existing schedule name
ETERNUS Web GUI User's Guide
Copyright 2011 FUJITSU LIMITED
to configure multiple events.
544
P2X0-1090-02ENZ0