ABB i-bus KNX Product Manual page 126

Energy actuator se/s 3.16.1
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

ABB i-bus
KNX
Planning and application
124 2CDC 505 084 D0203 | SE/S 3.16.1
3.
Parameterization:
Trigger 1 (Start) is activated by
Trigger 2 is activated by
The intermediate meter counts continuously and sends the meter reading every 15 minutes. Syn-
chronization with the timer occurs daily at 0:00.
4.
Parameterization:
Trigger 1 (Start) is activated by
At Trigger 1 (Start)
Reset "Intermediate meter"
Trigger 2 is activated by
Reaction when
limit is reached
The intermediate counter is enabled and switched on (1 bit communication object) and switches off
after 5 kWh has been consumed.
= Time (00:00)
= Duration (15 minutes)
= 1 bit communication object
= yes
= Limit (5 kWh)
= switch OFF until next switch operation

Advertisement

Table of Contents
loading

Table of Contents