ABB i-bus KNX Product Manual page 36

Energy actuator se/s 3.16.1
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

ABB i-bus
KNX
Commissioning
Transmission delay meter readings
in s [0...65,535]
Options:
The send delay time is used to minimize the bus load should the meter readings of several Energy Actua-
tors be requested simultaneously. When meter readings are requested, they will only be sent after the de-
lay time has timed out.
Note
Should a send delay be set and a meter reading is sent cyclically and on request, the send delay is
taken into consideration with the first cyclic sending and with every request.
Important
During the time where the sending delay of the meter readings is active, cyclic sending is interrupted for
all meter readings, including those where do not send on request is parameterized. The cycle time
continues to run in the background, and cyclic sending continues only after the send delay time has
timed out.
Cycle time for meter readings in s
[0...172,800, 0 = do not send cycl.]
Options:
This parameter determines the cycle time for cyclic sending of all meter values, provided that they are pa-
rameterized with the option cyclically.
All meters resettable via object
Options:
yes: The 1 bit communication object Enable reset meters and Reset meter readings are enabled.
Using these communication objects, all meter readings (main and intermediate meters) are set to zero,
and all intermediate meters are stopped.
For further information see:
Important
The meters can only be reset when the measurement process is active, i.e. rated voltage is present on
at least one output.
Enable "Meter reading total"
Options:
yes: The parameter window Meter reading total as well as the communication objects for the Meter to-
tal and the Intermediate meter total are enabled.
34 2CDC 505 084 D0203 | SE/S 3.16.1
0...65,535
0...900...172,800 (2 days)
no
yes
Communication
objects, page 92
no
yes