ABB i-bus KNX Product Manual page 76

Energy actuator se/s 3.16.1
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

ABB i-bus
KNX
Commissioning
Reset "Intermediate meter reading"
on trigger 1 (Start)
Options:
This parameter determines whether the Intermediate meter (meter reading) is reset when a telegram is re-
ceived on the communication object Trigger 1.... Alternatively, an additional 1 bit communication object
can be enabled, see parameter
76.
Send "Intermediate meter reading"
on trigger 1 (Start)
Options:
This parameter determines whether the Intermediate meter (meter reading) is sent when a telegram is re-
ceived on the communication object Trigger 1....
Trigger 2 is activated by
Options:
1 bit object: The 1 bit communication object Receive trigger 2 (A: Intermediate meter) is enabled. The
meter reading is sent if a telegram with the value 1 is received on this communication object. It is pos-
sible to parameterize whether the intermediate meter stops or does not stop.
Time: The 3 byte communication object Trigger 2 change time (A: Intermediate meter) is enabled. Us-
ing this communication object, the time for trigger 2 can be modified. The following parameters
appear:
74 2CDC 505 084 D0203 | SE/S 3.16.1
Hour [0...23]
Options:
0...23
Minute [0...59]
Options:
0...59
Weekday
Options:
Monday...Sunday
every day
The intermediate meter reading is sent if the parameterized time is received on the communication
object Receive time (General).
Note
The time is only required once per device for all meters.
yes
no
"Intermediate meter reading total" additionally resettable via
yes
no
1 bit object
Time
Limit
Duration
object, page

Advertisement

Table of Contents
loading

Table of Contents