Huawei SmartLogger1000 User Manual page 154

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
LCD
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
Operation Procedure
8. Choose Batch Remove and press
NOTE
For devices that no longer exist in the PV power
system, remove them in time to avoid wasting
system resources.
9. Select Addr. Allocate, set the start
addresses assigned for RS485-1, RS485-2, and
RS485-3, and then press
addresses.
6 User Interface
.
to allocate the
141

Advertisement

Table of Contents
loading

Table of Contents