Remote Output Control - Huawei SmartLogger1000 User Manual

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
Figure 8-6 Remote scheduling

8.2.5 Remote Output Control

Before setting the parameters for remote output control, synchronize the clock source of the
server. For details, see
Issue 12 (2019-01-15)
Disable, Strategy 1, and Strategy 2 are available for Schedule strategy.
Disable: The SmartLogger controls the inverter to work at full load and will not receive scheduling
commands sent by the NMS.
Strategy 1: Open-loop scheduling policy. That is, the SmartLogger evenly allocates the power value
from the scheduling and delivers the average values to each inverter, which then operates with the
specific power. The adjustment value delivered by the SmartLogger is constant.
Strategy 2: The customized function is provided for a site.
Adjustment coefficient: The power value will be sent to the inverter after being multiplied by the preset
coefficient.
7.10.1.1 Setting the Date and
Copyright © Huawei Technologies Co., Ltd.
8 Power Grid Scheduling
Time.
260

Advertisement

Table of Contents
loading

Table of Contents