Huawei SmartLogger1000 User Manual page 42

Hide thumbs Also See for SmartLogger1000:
Table of Contents

Advertisement

SmartLogger1000
User Manual
Figure 4-5 Connecting the terminal block (1)
Step 3 Connect the cable to the SmartLogger terminal block, as shown in
Figure 4-6 Connecting the terminal block (2)
(1) Wiring terminal
1.
2.
3.
Step 4 Insert the terminal block into the SmartLogger COM port.
Step 5 Insert the bare cable cores at the other end of the cable into a protection port of the RS485
signal SPD, as shown by (1) in
Issue 12 (2019-01-15)
Press the white contact plate of the corresponding wiring terminal to flip the metal spring
inside the wiring terminal.
Insert the uninsulated part of the core wire into the wiring terminal.
Release the white contact plate to fasten the core wire.
Copyright © Huawei Technologies Co., Ltd.
(2) White contact plate
Figure
4-7.
4 Electrical Connections
Figure
4-6.
29

Advertisement

Table of Contents
loading

Table of Contents