Mitsubishi Electric GOT2000 Series Connection Manual page 700

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(b)
Station information setting
Station type
Exclusive station count
Reserve/invalid station select
Intelligent buffer select (word)
*1
(2) Setting from sequence program
The parameter is written to the buffer memory, and the data link is automatically started when PLC CPU status
changes from STOP to RUN.
(a)
I/O signal of CC-Link module
(b)
Device used by user
M100, M101
M102, M103
12 - 58
12.4 PLC Side Setting
Item
*1
Specify the same number of occupied stations as that of the GOT.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether turning OFF
and then ON or resetting.
Control & Communication Link System Master/Local Module Type AJ61QBT11/A1SJ61QBT11
User's Manual
Device
Flag for parameter setting
Flag for data link startup
D0
Number of connected modules
D1
Number of retry
D2
Automatic reconnection station count
D3
Operation specification in the case of CPU failure
D4
Reserved station specification (Station No. 1 to Station No. 16)
D5
Error invalid station specification (Station No. 1 to Station No. 16)
D6
Station data (first module)
D400
Error code in the case of data link startup failure
Set value
Intelligent device station (fixed)
Exclusive station 1
No setting
(Use default value)
: Necessary
Application
Setting necessity at GOT
connection
: As necessary
: Not necessary

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents