■3. Parameter settings (Connection to MELSEC-Q, QS series) of System configuration1
(Network Type: CC IE Control)
(1) [Network parameter] of GX Developer
(a)
Network parameter
Network type
*1
Starting I/O No.
*2
Network No.
Total stations
Group No.
Station No.
*3
Mode
Network range assignment
Refresh parameters
Interrupt settings
Interlink transmission parameters
Routing parameters
*1
When using Q170MCPU or Q170MSCPU(-S1), set it according to the system configuration.
*2
Specify the same network No. as that of the GOT.
*3
Set the same mode setting as that of the GOT.
Item
Set value
CC IE Control (Control station) (fixed)
0000H
1
2
0 (fixed)
1
Online
Refer to (b)
(Use default value)
Refer to (c)
: Necessary
: As necessary
10.4 PLC Side Setting
Setting necessity at GOT
connection
10
: Not necessary
10 - 27