Cc-Link Connection (Intelligent Device Station) - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

4.2.3

CC-Link Connection (Intelligent Device Station)

This section describes the CC-Link connection (intelligent device station) that connects the GOT set as the intelligent device
station to the CC-Link network.
The following shows an example of connecting the GOT set as the intelligent device station to the CC-Link network.
Network No. 0, Station No. 0
(Master station)
Monitor target
Control
system
(System A)
■1. Connection method
Connect the CC-Link network system to the GOT.
For details, refer to the following.
■2. GT Designer3 setting
Set GT Designer3 as follows.
Setting item
Controller Type
Device setting (Network setting)
MELSEC Redundant Setting
In this case, the GOT monitoring is performed by transient transmission of the CC-Link network system. Therefore, a
longer time-lag occurs for displaying objects compared with directly monitoring the PLC CPU.
For displaying objects with a shorter time-lag, set the device for RX, RY, RWw, RWr of the host station set in the CC-
Link network and execute the cyclic transmission.
For details, refer to the following.
4 - 64
4.2 MELSEC Q Series
CC-Link
MELSECNET/H remote I/O network
12. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
MELSEC-QnA, MELDAS C6*
Other
Do not set the item.
3.3CC-Link System Access Range for Monitoring
Network No. 0, Station No. 1
(Standby master station)
Settings
NW No.: 0 (fixed)
Station No.: 0 (Master station)
CC-Link connection
GOT
Network No. 0,
Station No. 2
(Intelligent device station)
Standby system
(System B)
Model