Check On Gx Works2 - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

1.6.5

Check on GX Works2

■1. For CC-Link IE Controller Network system
Use [CC IE Field diagnostics] of GX Works2 to check if the GOT is correctly performed the data link.
For the GX Works2 operation method, refer to the following manual.
Startup procedure: GX Works2
1.6.6
Check on the PLC
■1. Checking the wiring state of the optical fiber cable (For CC-Link IE Controller Network
only)
Check if the fiber-optic cable is connected correctly to all the modules in the CC-Link IE Controller Network.
Perform the line test from the control station of the CC-Link IE Controller Network to check the wiring state of the fiber-
optic cable.
For the line testing method, refer to the following manual.
■2. Checking the wiring state of the CC-Link dedicated cable (For CC-Link system only)
Check if the CC-Link dedicated cable is connected correctly to all the modules in the CC-Link system.
Perform the line test from the master station of the CC-Link System to check the wiring state of the CC-Link dedicated
cable.
For the line testing method, refer to the following manuals.
1 - 52
1.6 Checking for Normal Monitoring
MELSEC-Q CC-Link IE Field Network Master/Local Module User's Manual
[diagnostics]
CC-Link IE Controller Network Reference Manual
CC-Link System Master/Local Module User's Manual QJ61BT11N
CC-Link System Master/Local Module User's Manual AJ61QBT11, A1SJ61QBT11
CC-Link System Master/Local Module User's Manual AJ61BT11, A1SJ61BT11
[CC IE Field diagnostics]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents