Connection To Qnascpu Or Anscpu - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

8.2.3

Connection to QnASCPU or AnSCPU

■1. When one GOT is connected
Extension base
unit
Extension cable
Extension
Extension
Main
cable
base
base
*1
Main
-
-
base
8 - 14
8.2 System Configuration
Main base unit
Connection cable 1)
PLC
connector
Connection cable 1)
conversion
box
-
-
GT15-
A1SC05NB(0.45m)
A7GT
GT15-A1SC07NB(0.7m)
-CNB
GT15-A1SC30NB(3m)
GT15-A1SC50NB(5m)
Bus extension
connector box
Connection cable 2)
Bus
Connection cable 2)
*2
GT15-
A1SC07B(0.7m)
GT15-
-
A1SC12B(1.2m)
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
GT15-C100EXSS-
1(10m)
GT15-C200EXSS-
-
1(20m)
GT15-C300EXSS-
*3
1(30m)
GT15-C100EXSS-
1(10m)
GT15-C200EXSS-
1(20m)
GT15-C300EXSS-
*3
1(30m)
Communication driver
GOT
GOT
*4*5
Model
Option device
GT15-75ABUSL
GT15-
Between main base
75ABUS2L
and GOT: 5m
GT15-ABUS
GT15-ABUS2
GT15-75ABUSL
GT15-
Between main base
75ABUS2L
and GOT: 30m
GT15-ABUS
GT15-ABUS2
Between main base
and GOT: 35m
GT15-75ABUSL
(Including between
GT15-
main base and bus
75ABUS2L
connector conversion
GT15-ABUS
box)
GT15-ABUS2
Between main base
and bus connector
conversion box: 5m
Bus(A/QnA)
Max. distance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents