Connection To Cc-Link Ie Field Network - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

4.1.4

Connection to CC-Link IE Field Network

■1. One-to-one connection of GOT and redundant system
(1) System configuration example
The following connection configuration examples are explained.
Control system
(system A)
N/W No.: 1
PC No.: 0
(2) Connection method
Connect the CC-Link IE Field Network system to the GOT.
11. CC-Link IE FIELD NETWORK CONNECTION
(3) PLC Side Setting (GX Works3)
(a)
Control system (system A) PLC setting
• Module parameter
Station type
Network No.
Station number setting
Station No.
Parameter setting
Network Configuration Settings
GOT
1)
2) 5)
4)
3)
1) Process CPU
2) Redundant function module
3) Tracking cable
4) CC-Link IE Filed Network Master/Local module (GOT connection)
5) CC-Link IE Filed Network Master/Local module (Remote I/O station connection)
Item
N/W No.: 1
PC No.: 2
Ethernet cable
(Redundant system: Pair No.1)
1)
2) 5)
4)
Set value
Master station (fixed)
1
Parameter
0 (fixed)
Engineering tool
Refer to next page
4.1 MELSEC iQ-R Series
Standby system
(system B)
N/W No.: 1
PC No.: 1
4 - 19
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents