Mitsubishi Electric GOT2000 Series Connection Manual page 80

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■2. Checking the wiring state (For optical loop system only)
Check if the optical fiber cable is connected correctly in [Loop test] of GX Developer.
For the GX Developer operation method, refer to the following manual.
(1) Check the [Receive direction error station] (The display example on GX Developer Version 8)
Startup procedure: GX Developer
■3. Checking if the GOT is performed the data link correctly
(1) For MELSECNET/H, MELSECNET/10 network system
Check if the GOT is performed the data link correctly in [Other station information].
For the GX Developer operation method, refer to the following manual.
(a)
Check [Communication status of each station] and [Data-Link status of each station] (The display
example on GX Developer Version 8)
Startup procedure: GX Developer
Other station info.
1 - 50
1.6 Checking for Normal Monitoring
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
[Diagnostics]
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
[Diagnostics]
[MELSECNET (II)/10/H diagnostics]
[MELSECNET (II)/10/H diagnostics]
Loop test

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents