Mitsubishi Electric GOT2000 Series Connection Manual page 258

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■2. Method for using the screen changing function
• As a feature of this function, monitor screens are created for each station number.
When the system switching occurs, the GOT can change the monitoring target to the control system PLC CPU on
the other monitor screen.
• To achieve this, the script of the GOT monitors the special relay SM1515 (Control system identification flag) of the
PLC CPU and stores the screen number corresponding to the latest station number of the control system into the
screen switching devices.
• Precautions:
There are the following 8 different screen switching devices.Set the screen switching devices for all screens to be
used.
(1) Base screen switching device
(2) Overlap window 1 switching device
(3) Overlap window 2 switching device
(4) Overlap window 3 switching device
(5) Overlap window 4 switching device
(6) Overlap window 5 switching device
(7) Superimpose window 1 switching device
(8) Superimpose window 2 switching device
(1) Setting method (For MELSECNET/H connection, MELSECNET/10 connection)
System configuration example 1: MELSECNET/H connection, MELSECNET/10 connection
Station No. 3
MELSECNET/H network module of control system
MELSECNET/H network module of standby system
GOT connected to MELSECNET/H network or MELSECNET/10 network
Step 1.
Set the screen switching device of the base screen.
Select [Common]
device GD100 as the base screen switching device.
4 - 82
4.2 MELSEC Q Series
MELSECNET/H
(MELSECNET/H mode or MELSECNET/10 mode)
Network No. 1
GOT
Control system
Q25PRH
CPU
(System A)
Station No. 1
Connected module
[GOT Environmental Setting]
QJ71
Q25PRH
BR11
CPU
Station No. 2
Network No.
[Screen Switching/Window], and set the internal
QJ71
Standby system
BR11
(System B)
1
Station No.
1
2
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents