1. Playback an alignment Tape.
2. Confirm the R/P Envelope Level is in the specification.
3. If it is not adjust ENV waveform Adjustment and LISTA Adjustment.
5.7. Measure Parts Replacement and Adjustment
General
Note the following items for each part replacement.
1. Turn Power Off before replacement.
2. Use the correct tool in the Jigs and Tools list.
3. After replacement clean the VTR according with the cleaning
procedures.
5.7.1. Cylinder Unit Replacement
(Removal of Cylinder Unit)
1. Remove the T1 guide and cleaning arm unit. (Refer to the cleaning
arm unit replacement.)
2. Remove 2 connectors (P5002, P5003) on the Head Buffer board and
remove the screw on the flexible cable.
Note:
Be careful to remove the flexible cable from the connector. Do
not touch on the cylinder surface by finger directly.
51