UNIVERGE SV8100/SV8300
System Hardware Manual
Figure 4-57 Floor Mount Spacing Guide
2.
Mark and drill the four holes required for installing the CHS
BASE UNIT.
3.
Align bolt holes in CHS BASE UNIT (see
Mount Spacing Guide on page
and secure using four anchor bolts.
4.
Align and install the CHS LARGE BATT BOX on top of the
CHS BASE UNIT. Refer to
LARGE BATT BOX using the CHS2U JOINT BRACKET KIT on
page
4-50.
Figure 4-57 Floor
4-49) with holes drilled in floor
Figure 4-58 Installing the CHS
Issue 1.0
4 - 49