Table 6-59 Cd-Rtb Maximum Upgrade Capacities - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
System Hardware Manual
The VoIPDB, which is required for IP telephones to communicate
with non-VoIP UNIVERGE SV8100/SV8300 telephones, and place
or receive outside calls, must be connected to either an external
switching hub or to the Router blade.
The blade plugs into a universal slot and does not consume any
ports. Each blade provides eight RJ-45 port connectors. These are
used to connect to LAN terminals. Depending on the type of LAN
terminal, the blade may not be able to detect the difference between
straight cable and cross-cable automatically. If auto-crossover is not
functioning, use straight cable for that terminal connection.

Table 6-59 CD-RTB Maximum Upgrade Capacities

maximum capacities for the ESIU blades when they are upgraded.
Table 6-59 CD-RTB Maximum Upgrade Capacities
19" Chassis
with CPU
1
The Router blade can also be used to provide power over category 5
network cables. This eliminates installing separate power adapters
for each IP telephone and it allows for centralized power backup.
6.4.2
Installation
To install the CD-RTB:
1.
Plug the CD-RTB blade into any universal slot.
2.
Refer to the Univerge SV8100 Programming Manual for
required programming.
19" Chassis
19" Chassis
without CPU
2
Issue 1.0
provides the
Networked
x4
Chassis
8
50
6 - 115

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents