Insert the access panel tab into the slot on the rear of the CHS2U-US
chassis (see
Figure 5-84 Re-Install Fan Access Panel (CHS2U-US
Chassis)).

Figure 5-84 Re-Install Fan Access Panel (CHS2U-US Chassis)

8.
Secure panel withe retaining screw (refer to
Access Panel (CHS2U-US

Install External Batteries (with CHS LARGE BATT BOX)

An external battery source with CHS LARGE BATT BOX can be used to long
battery life in the event of a power failure.
The CHS LARGE BATT BOX can provide 45 minutes backup time or 3 hours
backup time.
Figure 5-84 Re-Install Fan
Chassis)).
Issue 1.0
5 - 63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents